When Should You Order Glazing? Work Backwards from Your Fitting Date
Plan the survey, sign-off, manufacture and delivery around when your fitter can actually install your glazing.
Plan the survey, sign-off, manufacture and delivery around when your fitter can actually install your glazing.
Set a date for the opening to be ready
Start with the week your fitter expects to install and check when the builder will be able to verify the opening. Put the site survey and any items that affect the frame, such as cills or finished floor levels, on the schedule.
Ask when the lead time starts
Ask the supplier what has to happen before the order goes into production. Final dimensions, the drawing, colour, glass and payment may all need to be agreed. Distinguish the estimated factory lead time from the carrier’s confirmed delivery date.
Agree who handles delivery
Keep contact details for the site, fitter and carrier to hand. Check vehicle access, whether help is needed to unload and where the glazing can go if installation is later.
A useful check before you order
Take a photo from each side of the opening and annotate the dimensions your fitter has checked. Keep the latest drawing with the written quote so everyone is working from the same layout. Record any size, finish or glass option that still needs approval.
Is a lead time a delivery appointment?
Ask whether a quoted lead time refers to production, dispatch or arrival at your address. Your carrier may confirm the delivery slot separately, so arrange fitting with that distinction in mind.
Ready to price your project?
Browse the SmartaView range to compare the available products. For a bespoke arrangement, send SmartaView your measurements, photos and delivery postcode. Include your desired fitting date so we can check the specification and available lead time.
Author at Smartaview, writing about aluminium glazing, home improvements and the buying process.